Study of ten bridges on the Da Beira Alta Railway Line, Pampilhosa-Mangualde section in Portugal.

Client:
Prointec Ingenieria

Location:
Portugal
Key data:

10 bridges, years 1882-1995, spans between 14 and 54m. Riveted and concrete metal structures

Services:

Inspection, characterisation of materials and analysis of the current state and the conditioning factors that pose to the rehabilitation of the Line. Recommendations on the repair and reinforcement actions to be carried out.

Year:
2017