STUDY OF THE PEDRIDO BRIDGE IN THE BETANZOS ESTUARY

Client:
BOARD OF DIRECTORS

Location:
Ferrol. Spain
Key data:

Year of construction: 1939-1942. Total length 520 m. The central span, a 78 m reinforced concrete arch, was a world record in its day. More than 500 tests carried out.

Services:

Inspection, Data collection and tests, Analysis and reporting of conclusions on the origin of the damage. Rehabilitation Project

Year:
2012