Technical Institute of Materials and Constructions.
STUDY OF THE DURABILITY CONDITIONS OF ELEMENTS OF THE THIRD BRIDGE OVER THE ORINOCO
Location:
Caicara del Orinoco. Venezuela
Caicara del Orinoco. Venezuela
Key data:
Length 11.1 km (2nd in America). Height of the pylons :142 m
Services:
Inspection, On-site testing, Laboratory testing. Report
Year:
2012
2012