Technical Institute of Materials and Constructions.
This new infrastructure is executed annexed to the existing hospital and has a constructed area of 64,442.07 m2, with floor dimensions of 235.89 by 126.82 meters, and 16.32 meters in height that rises to 20.47 m with the Heliport. The building is composed, from a volumetric point of view, of a semi-basement and a large plinth, which houses the ground floor and the first floor, from which three bodies of approximately 50×17 m2 emerge with the second and third floors and a technical roof. The work will end with the move from one building to the other and subsequent demolition of the current hospital, allocating the freed space to car parks and garden areas.
Technical assistance and project quality control, execution control and final tests of installations.
Technical Institute of Materials and Constructions.
This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.
Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.
If you disable this cookie, we will not be able to save your preferences. This means that every time you visit this website you will need to enable or disable cookies again.
This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.
Keeping this cookie enabled helps us to improve our website.
Please enable Strictly Necessary Cookies first so that we can save your preferences!