Technical Institute of Materials and Constructions.
Sections: Fuentes-Monteagudo de Las Salinas and Monteagudo de las Salinas-Monteagudo de las Salinas (Tendero Tunnel). Construction of the Cubillos and Tendero tunnels with a length of 1,500 and 1,100 metres respectively with free sections of 115 m2 and the Dehesillas Viaduct with a total length of 612 metres (central spans of 46 m) with a prestressed concrete box girder typology. Maximum pile height of 28 meters.
The functions that INTEMAC performs in its Technical Assistance Units on site are: Quality Assurance, Geometric, Qualitative and Quantitative Control, Supervision of Construction Engineering, Control of Deadlines and Budget, Environmental Coordination, Health and Safety Coordination and Specialized Assistance of Incidents on Site.
Technical Institute of Materials and Constructions.