INSPECCIÓN19 BRIDGES IN EL SALVADOR

Client:
ACCIONA INGENIERÍA

Location:
El Salvador. El Salvador
Key data:

Bridges built between 1920 and 1960 affected by floods, etc. Lengths 120 m – 15 m.

Services:

Inspection, Inventory, Database Entry, Main Inspection, Action Plan for Detailed Study (Special Inspection)

Year:
2009