Technical Institute of Materials and Constructions.
Detection of delaminations in the Talavera cable-stayed bridge
Location:
Talavera. Spain
Talavera. Spain
Key data:
Viaduct with a span of 318 m and a pylon of 172 m height above the deck.
Services:
Eco Impact Tests. Interpretation of results. Report on the actions to be carried out.
Year:
2011
2011