Control and surveillance during the works Highway of the Camino de Santiago, A-12, Section: Santo Domingo de la Calzada – Villamayor del Río

Client:
MINISTRY OF PUBLIC WORKS

Location:
La Rioja – Burgos. Spain
Key data:

Construction of a 14.36-kilometre section of motorway with two two-lane carriageways of 3.50 metres each, separated by a median, 3 junctions, 13 transverse drainage works in trunks and 20 transverse drainage works in branches, 3 viaducts with prefabricated double-T beam decks, 6 overpasses, 5 underpasses and a metal footbridge for the replacement of the Camino de Santiago.

Services:

The functions that INTEMAC performs in its Technical Assistance Units on site are: Quality Assurance, Geometric, Qualitative and Quantitative Control, Supervision of Construction Engineering, Control of Deadlines and Budget, Environmental Coordination, Coordination of Health and Safety and Specialized Assistance of Incidents on Site.

Year:
2020 – Actual