Control and surveillance during the construction works of the platform of the new Levante High-Speed rail access. Madrid-Castilla La Mancha-Valencian Community-Region of Murcia.
Location:
Cuenca. Spain
Cuenca. Spain
Key data:
Sections: Fuentes-Monteagudo de Las Salinas and Monteagudo de las Salinas-Monteagudo de las Salinas (Tendero Tunnel). Construction of the Cubillos and Tendero tunnels with a length of 1,500 and 1,100 metres respectively with free sections of 115 m2 and the Dehesillas Viaduct with a total length of 612 metres (central spans of 46 m) with a prestressed concrete box girder typology. Maximum pile height of 28 meters.
Services:
The functions that INTEMAC performs in its Technical Assistance Units on site are: Quality Assurance, Geometric, Qualitative and Quantitative Control, Supervision of Construction Engineering, Control of Deadlines and Budget, Environmental Coordination, Health and Safety Coordination and Specialized Assistance of Incidents on Site.
Year:
2004-2007